Wednesday, October 9, 2013

A Christmas pillow project

In January I started sewing with the Across the Pond Sew-Along.  Around the same time I started sewing a quilt with the Sisters' Ten Block of The Month project.  Over the past several months both of these sew-alongs have taken the back seat to the Patchwork, Please! Zakka sew-along.  One of the projects I had put aside was the Topiary Tree Pillow, designed by Amy of eamylove.  I'm so happy to say I've finally finished it!
 It's been awhile since I've sewn a pillow, and quite honestly, I've never been very pleased with my end product.  The design and instructions for this one, though, had great results!  I used a lovely fabric collection by Moda called "Espirit de Noel."
 One of the best features of this pillow is the hidden zipper on the pillow back.  I'm sure this will be my "go to" pattern for pillow backs!
 It is easy to get the pillow form in and out.  Thank you, Amy, for such a great pattern!!

Sunday, September 29, 2013

Handy Market Tote

Can one ever have too many market totes, grocery bags, book totes, etc.?  In my opinion, "No!"  The Handy Market Tote was my project this week for the Patchwork, Please! Sew-along.  It is a great tote.
 It features two large pockets on the outside (one on each side) ...
and a small one on the inside.
This bag is fully lined, and very roomy. Although there are a lot of pieces to the bag, it went together easily.  I love a project like that!
This sew-along is winding down, with only two weeks left to go.  I'm posting my project at A Quilter'sTable.  Check out the many other great market totes posted there.

Sunday, September 15, 2013

A walk in the Meadow kind of day... and Patchwork, Please!

Today was one of those days ... cooler air, beautiful sunshine, and the call of the mountains!  A walk in the meadows is always a favorite!  Every season has a different look.  I love the colors in this picture of the golds and greens ... maybe a future project inspiration.


 So ... this week's project was a Vintage Pencil Case.  I started working on this at 6:24 this evening, and estimated it would take about 2 hours.  Despite the tiny paper piecing involved in making the pencil tips, I finished in just over 2 hours!



There are just 4 projects left to go in the Patchwork, Please! Sew-along.  It has been a fun sewing "journey", and to date I've only skipped one project, but I'm ready to bring this to a close and move on to some of my other sewing.

Here's a quick look at last week's project, too.  Somehow I missed posting it here...





Wednesday, September 4, 2013

A BIG bag!

How about this for a big bag?
 This thing is really BIG.  I think I will be able to fit all my groceries for the week in it!  As usual, I made a few adjustments to the pattern.  Adjustments made for the most part due to not having certain things on hand, and -- yes -- once again waiting until the last minute to start.
 Sadly, my last minute this time was not soon enough for entering my bag in the give-away drawing.  I DID finish it, though, and it's ready to go. Ok -- the changes.   I did not have cotton straps with which to make the handles, so I used a cotton fabric instead.  For the body of the bag I used a painter's drip cloth --unused! (Hmmm...a used paint drip cloth would make an interesting bag!)  I also did not line the bag with laminate fabric or a plastic table cloth as suggested.
I will use it, and see what I think about the size.  I'm still not sure... :)

Sunday, August 25, 2013

Happy Hexagon Trivet ... The REAL project #12

Fall is one of my favorite seasons.  Although we are not officially there, the unwinding of summer is already falling into the steady routine of autumn.  Ahhh....  It is the kind of order and routine I like.  The break from the ordinary pace is appreciated, and needed, but getting back into a regular schedule always feels good to me.

 This little project was a fun one to make.  There was repetition and order in the piecing of the trivet.  It was done using the paper piecing patchwork technique, which I am happy to say, is getting easier for me to do.  Some time ago I had found a printed linen fabric with great illustrations of old advertisements.  The chickens seemed perfect for this project (maybe because it was the one that fit best in this space!).  I paired it with fabrics from the Dear Stella fabric collection left over from my Sister's Ten Modern Block of the Month project.
The project is quilted with machine stitching with following the hexagon shape around each layer.  I'm posting this project here (A Quilter's Table).

Sunday, August 18, 2013

Week #12...

My Zakka project for this week is MUCH smaller than the project in the book!  The envelope/pencil wall hanging caught my eye the first time I looked through the book, but I simply did not have the time or energy this week to complete it.  So...to stick with at least a little bit of the project, and to recognize the start-up of the new school year -- I settled on making a pencil mug rug using the pencil blocks from the bottom left corner of the project.
The pencil blocks were fun to make...and I feel certain I'll eventually give those envelopes a try as well.

Fun polka-dots!


Pencils are sharpened for school.  Ready, set, go!  Looking forward to the joys and challenges of teaching in the year ahead.

Sunday, August 4, 2013

Patchwork, Please! Project #10 -- My Scrappy Box

Today was a "rest-up-from-vacation" day.  You know how that goes!  I had already decided I was going to skip this week's Zakka project.  Well ... around 8:00 I thought I would just LOOK at the pattern.  Two hours later my Scrappy Box if complete!  
So much for not making this week's project! :)